This one Day
Galaxy Oil & Gas Training Course is a
workshop planned for the Oil & Gas
E&P companies to congregate who and who that are to take part in
upcoming Drilling of Oil Wells.
Training Objectives
What are the Goals?
The
participants will be able to learn the
following:
(1). bringing the drilling team together
before spudding
(2).
Acknowledge and strengthen team
bonds.
(3)
Provide a meeting place for all
personnel involved with operation (operator, contractor
and service Co.) to meet and how to become more acquainted on a social level.
(4).
Receive first hand information from
project personnel about safety policies, the
plan and special features of the project.
(5). To provide a launching pad for the operators representatives,
contractors
and tool pusher to put the planning of
the pre-spud workshop into practice at
the rig site.
Target Audience
Who is this Training
Course for?
Well
site engineers, drillers, contractors, assistant drillers, drilling engineers,
oil and gas workers, mud engineers, mud loggers and any other personnel
interested in pre spud planning.
Training Methods
How will this Training
Course be Presented?
Preferably,
this training can be delivered at premises of the operator or a suitable place
that the operator will congregate its personnel those of contractor and service
companies in batches as the their work schedules would permit.
Participants will engage in a highly interactive learning
experience, with a blend of class room learning, exercises, group work and
discussion. The instructor will apply a range of proven adult learning teaching
and facilitation techniques, which will address participants’ learning
preference styles. Active participation is essential, to share experiences and
expertise of the tutor, as well as the participants. We can all learn from each
other.
Daily Agenda
COURSE
CONTENT
vPre Spud planning
introduction
vThe
problem solving cycle
vRecording
and documentation (recording drilling parameters, top drive connection
practice, driller handover, shaker handover , stuck pipe report form).
vThe
well plan
vStuck
pipe mechanism
vVertical
/ high angle hole cleaning
vPlastic
formation (Gumbo attack)
vBallooning
shale
vSurge
pressure and pressure while drilling (PWD) data
Certificate Awarded
Participants of The PreSpud Planning
Workshop receive certificate of
completion.